Case study: Waterfront Leisure Centre Greenock
Project type – Service
Client – Inverclyde Council
Contracted to – Inverclyde Council
Architect – NA
M&E Consultant – NA
Value – £25K
Specification: Paging and fire evacuation (BS5839)
Only 30 minutes from the centre of Glasgow, the Waterfront Leisure Complex, includes a state of the
art fitness studio, swimming pool, ice rink & conference facilities. After being open to the public
for several years, the fire EVAC system needed servicing, renovation & renewal.
Audio Light Systems teamed up with Baldwin Boxall for this extensive fire EVAC (BS 5839) system refurbishment. The engineers found the original system requiring an update and started the arduous task of amending and replacing electronics and backup battery systems. Once the updates & renewals were completed, the system was commissioned & tested for its paging and EVAC functions and was running up to the original specification.
Case study: Radisson Hotel Glasgow
Project type – Consultation, installation & service
Client – Radisson Hotels
Contracted to – Radisson Hotels
Architect – NA
Specialist Consultant – Audio Light Systems Ltd
Value – £25K
Specification: Visual display systems
Case study: Smart City Hostels
Project type – Consultantation & Installation
Client – Smart City Hostels
Contracted to – Smart City Hostels
Architect – NA
Specialist Consultant – Audio Light Systems
Value – £20K
Specification: Back ground music system
Case study: Amicus Apple
Project type – Consultant & Installation
Client – Amicus Apple
Contracted to – Amicus Apple
Architect – NA
Acoustic Consultant – Robert Mackenzie Partnership
Value – £5K
Specification: Back ground music limiting system
Case study: DGone
Project type –Installation
Client – Dumfries & Galloway Council
Contracted to – Dumfries & Galloway Council
Architect – NA
Specialist Consultant – Malcolm Innes
Value – £5K
Specification: Visual Display Systems
DG1 is Dumfries & Galloway's high profile entertainment and leisure complex is located in Dumfries town
centre. The multi million pound building is well used and well liked in the local area. The council were
looking to brighten up the entrance facade with bright moving image. After a consultation period it was
decided a rear projected image on the glass panels above the door would be the answer. Audio Light Systems
were employed to install the tricky twin projector system, due to their passed experience with unusual
installations.