Audio Light Systems - Case Studies - Theatre



Theatre Royal Newcastle Case study: Theatre Royal, Newcastle

Project type – Installation

Client – Newcastle City Council

Contracted to – Surgo Construction

Architect – Sansome Hall

Specialist  Consultant – Charcoal Blue

Value – £265K

Specification: lighting, paging, infra-red, visual display, signal distribution, Lighting Bars, RF Distribution, Ring Intercom, Show Relay

Audio Light Systems Ltd has recently completed work at the Theatre Royal Newcastle on the restoration project.

The ambitious development required the technical infrastructure to be replaced in the main auditorium and surrounding spaces. Audio Light Systems working to a Charcoal Blue specification completed the 5 month build with the usual high standards required for this level of work.



Theatre Royal Newcastle Case study: Theatre Royal, Newcastle

Project type – Installation

Client – Newcastle City Council

Contracted to – Lorne Stewart

Architect – N/A

Specialist  Consultant – Newcastle City Council

Value – £20K

Specification: Production lighting dimmers

The Theatre Royal Newcastle were given the go ahead to replace there long lasting dimmer system with 5 ETC Sensor racks and a additional 4 sine wave packs. After a long process of decision making Audio Light Systems were chosen as the installation company for the project.
During the same period the theatre was also undergoing a re-wire which also had to incorporate into the dimmer installation. Audio Light Systems design engineering team had to be incorporated into the installation to allow a smooth transition from the old to the new.
Andy Main (Theatre Royal, Newcastle) commented "A very impressive installation!"



Traverse Theatre Case study: Traverse Theatre, Edinburgh

Project type – Installation

Client – Traverse Theatre

Contracted to – Traverse Theatre

Architect – N/A

Specialist  Consultant – Audio Light Systems Ltd

Value – £10K

Specification: Paging System

When it comes to paging and show relay Audio Light Systems have the wealth of experience required to upgrade and repair the most complex of system.

So when it came to the Traverse Theatre looking for a contractor to modernize their system, Audio Light Systems was the clear choice. The stage managers desk has been rewired and reconfigured to allow for the installation of the ASL paging and signal processor components. The new installation gives the theatre a multi bus, multi zone, priority system fit for the most demanding of situations.



Edwardn Alleyns School London Case study: Michael Croft Theatre London

Project type – Installation

Client – Edward Alleyn’s School

Contracted to – Rooff ltd

Architect – Heyningen and Haward

Specialist  Consultant – Theatreplan LLP

Value – £190K

Specification: Production audio & lighting, paging, infra-red, visual display, signal distribution, Lighting Bars, RF Distribution, Ring Intercom, Show Relay

“SOME say the brightest modern theatre space in London is the brand new Michael Croft Theatre at Alleyn's School in Dulwich... The state of the art 360-seat theatre, which will also be used by the National Youth Theatre, is more comfortable than the West End, more trendy that the Almeida, more aesthetically pleasing than the South Bank.” The Evening Standard

The installation of performing arts technology at the Michael Croft Theatre is an example of Audio Light Systems providing all the technical disciplines to one venue. Supplied & Installed systems include, production audio & lighting, AV & specialist systems at the venue.



Belgrade Theatre Coventry Case study: Belgrade Theatre Coventry

Project type – Installation

Client – Belgrade Theatre Trust

Contracted to – ISG Interior/Exterior

Architect – Stanton Williams

M&E  Consultant –

Value – £50K

Specification: Ring intercom,  stage management,

show relay, paging, video communications


The refurbishment at Belgrade Theatre was a welcome addition to the performing arts scene in Coventry. The specification for the build was consultant-driven, with a range of typical theatre technical requirements including; working lights, paging, show relay & ring intercom. Over 10,000m of cable were installed over a 12 month build. Showing excellent form, only one cable fault was reported in the entire job! John Miller (Belgrade Theatre) commented “Audio Light Systems did exactly what they said they would do and it was a clear advantage having a knowledgeable specialist on site”.



Theatre Royal Newcastle Case study: Theatre Royal Newcastle - IR

Project type – Consultation & installation

Client – Theatre Royal

Contracted to – Theatre

Architect – NA

Specialist  Consultant – Sennheiser

Value – £35K

Specification: Infra red


One of the UK’s most famous theatres, The Theatre Royal Newcastle, required an upgrade of their old assistive hearing systems to a modern Sennheiser Infra red dual channel solution. The Theatre, which is a grade 1 listed building, needed an installer with a history of work in graded buildings while also having a knowledge of technical theatre systems. Audio Light Systems were the obvious choice, providing both the workmanship and the specialist skills required to carry out such a delicate installation. 14 IR radiators were installed around the 170 year old theatre auditorium to ensure even coverage across all the seating areas. The radiators transmit via infra-red light an audio signal to the  audience members headsets, giving clear audio for the hard of hearing and audio description for the visually impaired.



Usher Hall Edinburgh Case study: Usher Hall Edinburgh

Project type - Installation

Client – Edinburgh City Council

Contracted to – Balfour Kilpatrick

Architect – Law Dunbar Naismith Partnership

M&E Consultant – Irons Foulner

Value – £80K

Specification: Building wide paging & show-relay


The Usher Hall in Edinburgh is one of the UK’s most prestigious concert Halls. It underwent a 10 million pound redevelopment, giving the venue more modern facilities and greater space. As part of the upgrade a great deal of the technical systems were expanded and renewed, including the paging and show relay system.

Using over 10km of cable, over 100 speakers and a project lasting over 2 years, Audio Light Systems met the challenges with the skills required on this unique refurbishment project. The 10 zone paging and show relay system was designed to deliver an expandable, versatile solution which will last for many years.



Theatre Royal Newcastle Case study: Theatre Royal Newcastle - studio Theatre

Project type – Consultation, Installation & service

Client – Theatre Royal Newcastle

Contracted to – Theatre Royal Newcastle

Architect – NA

Specialist  Consultant – Audio Light Systems & Theatre Royal

Value – £30K

Specification: Production lighting & lighting grid


As part of the refurbishment at the Theatre Royal, Newcastle an education studio theatre was required. This was to be used as a learning and performance space.

Audio Light Systems were presented with a bare shell with some old internal steel structure. A bespoke lighting grid and wiring infrastructure was installed to marry up to the existing steelwork. The end result was a typical example of a studio theatre with 36 ways of lighting dimmers and a matching patch panel. The lighting grid specification called for a black finish which was achieved using anodised black alloy for all the main components.



Perth Concert Hall Case study: Perth Concert Hall

Project type – Consultation & installation

Client – Horsecross Theatres

Contracted to – Horsecross Theatres

Architect – NA

Specialist  Consultant – Audio Light Systems Ltd

Value – £15K

Specification: Control systems


Perth Concert Hall is one of Scotland newest venues, which encapsulates a 1,200 seat auditorium, conference facilities, exhibition spaces plus much more. To increase their capability, extra control systems were necessary to help meet their demanding requirements. A Crestron Control system was opted for, due the reputation for quality and stability. LCD touch panels controlled the audio visual, production lighting, house lighting and also interfaced to the fire alarm system. 



Theatre Royal Newcastle Case study: Theatre Royal Newcastle - Communications

Project type – Consultation, installation & Service

Client – Theatre Royal Newcastle

Contracted to – Lorne Stewart

Architect – Napper Architects

Specialist  Consultant – Audio Light Systems Ltd

Value – £40K

Specification: Paging, show relay & ring intercom


After an extensive 7.2 million refurbishment the Theatre Royal Newcastle fully reopened to the public to  rave reviews. The project included extending the stage and installing new and improved technical facilities. This was part of a larger project which involved extending the theatre’s facilities into the old Barclays Bank building on Market Street, creating a new Learning Space, Box Office and bar/bistro, revitalising the theatre building and consolidating its position as one of the great theatres of Europe. Audio Light Systems were responsible for the extending & installing to the paging, communications and video systems over the 5 floors and performance spaces.


Audio Light Systems

Audio Light Systems

Belfast: 028 9267 9664
International: +44 28 9267 9664
enquiry@audiolightsystems.com

Edinburgh: 0800 043 4600
International: +44 131 657 6313
enquiry@audiolightsystems.com